Licensed & insured · CSLB #886079 Serving Pasadena, Glendale, Burbank & Greater Los Angeles (626) 726-3989

Methodology · Last reviewed August 2026

How the permit cost estimator works

Every fee the tool calculates, the code section or adopted fee schedule behind it, and the date that source was last amended. Including what the tool refuses to calculate and why.

What the tool does

The permit estimator takes a city, a project type, a floor area and a construction valuation, and returns the itemised permit and plan check fees that jurisdiction publishes for that project.

It calculates published fee schedules. It is not a quote, and it is not a substitute for the fees your building department actually assesses when it sees your drawings. Scope-dependent items that no form can know about are excluded and named rather than folded silently into a total.

City of Los Angeles

How the LADBS calculation is built

Los Angeles derives almost every fee from one base figure, so the order of operations matters more than it does elsewhere.

FeeBasisSource
Building permitTable 1-A, applied to total valuationLAMC 91.113, incorporated by 91.107.2.1. Ord. 185,587, effective 16 Jul 2018
Energy code increase10% of the permit fee, and part of the plan check baseTable 1-A footnote
Plan check90% of the permit fee including the energy increaseLAMC 91.107.3.1.1
Electrical / plumbing / mechanical26% / 26% / 13% of the building permitTable 1-A.1 combined permit
Plan maintenance2% of the permit fee, floor $10, cap $300LAMC 91.107.4.3
Fire hydrant fee0.22% of valuation, only at $50,000 and aboveLAMC 91.107, amended 12 May 2009
Systems development surcharge6% of the covered feesLAMC 98.0416
City planning surcharge6% of the permit fee plus $5LAMC 98.0418
General plan maintenance7% of the permit fee plus $5LAMC 98.0418
Green building surcharge10% of permit and plan checkLAMC 99.01.107
Strong motion instrumentation0.00013 of valuation, minimum $0.50. Excluded from the plan check basePublic Resources Code 2705; CGS fee schedule
State building standards$1 per $25,000 of valuation or fractionDGS / BSC
Permit issuing fee$27LAMC 98.0415, last amended 8 Aug 2011

Three things that are easy to get wrong

Table 1-A applies its rate to the total valuation. Not to the portion above the bracket floor, which is how nearly every other fee table in the state works. This is checkable rather than a matter of opinion: under the total valuation reading every bracket boundary in the table meets exactly, and under the ordinary reading none of them do. We test this automatically whenever the fee data changes.

"Each additional $1,000 or fraction thereof" means round up. A project one dollar into a bracket pays the full increment. Treating it as simple division understates every fee, and it also hides the genuine steps that exist in some cities' schedules. We had this wrong in an early draft and corrected it against the adopted documents.

Plan check is 90 per cent, not 80. Secondary sources routinely cite 80 per cent for building plan check and attribute it to a section that says nothing of the kind. The 80 per cent figure is the electrical plan check rate under LAMC 93.0233(b), which is a different fee on a different base. Building and structural plan check is 90 per cent under LAMC 91.107.3.1.1.

Where the valuation figure comes from

The tool asks you for your construction cost because that is how the permit application works. LADBS application forms contain a project valuation field that the applicant completes, and the department describes that figure as the total cost of construction.

The department also reserves the right to revise it. Its own forms warn that an owner's valuation "may be increased by the Department in accordance with the Department's current valuation schedule". So the fee you see here is the fee for the number you entered. If the city considers that number understated, it can raise it, and the fees rise with it.

What we will not tell you, because no primary source documents it, is that the city mechanically takes whichever of the two figures is higher.

The school fee threshold

Education Code section 17620(c) permits a school developer fee on "other residential construction" only where the resulting increase in assessable space exceeds 500 square feet. Below that, none applies. Above it, the fee attaches to the whole increase rather than the excess.

The current LAUSD residential rate is $5.38 per square foot, effective 11 August 2026, raised from $5.17 by the State Allocation Board. Sources still quoting $5.17 are out of date.

A new dwelling unit is a separate statutory category, so the 500 square foot exemption is not applied to ADUs. Instead the tool applies the state impact fee exemption for accessory dwelling units under 750 square feet.

What the tool will not tell you

Some of these are gaps in the public record rather than gaps in our research, and we would rather show you a blank than a plausible invention.

  • Regular plan check turnaround. There is no current published figure. The department's own page says "weeks" and dates from 2014.
  • How many correction rounds to expect. No official source exists. The number that circulates in the industry is not sourced to any agency.
  • Whether electronic submittal is faster. Widely asserted, never measured in anything published.
  • Sewer facility charges. The rates are published, but they depend on occupancy sewage-generation factors and credits for existing use, which a form cannot determine.
  • Site-specific reviews. Grading, geology, hillside review, methane zones, fire sprinklers and planning clearances are all excluded and named in the result rather than folded into a total.
  • Two cities' current schedules. Both have revised recently. The tool declines to quote them rather than publish a figure we cannot verify against the adopted document.

Sources

What we relied on

Fee schedules change. Los Angeles adjusts its code fees every 1 July by local CPI, and most cities adopt new schedules with their annual budget. This page carries a review date for that reason.

Found a problem?

Tell us and we will fix it

If a fee here is out of date, a schedule has been superseded, or you have been invoiced something materially different by a building department, we would like to know. We would rather hear it from you than keep publishing something wrong.

Call (626) 726-3989 or email [email protected].

If what you want is a real number for your house, that is the estimate conversation instead, or go back to the permit estimator.

Call (626) 726-3989 Talk to Us